<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>World | Long Haul Ledger</title>
    <link>https://longhaulledger.com/</link>
    <atom:link href="https://longhaulledger.com/feeds/world.xml" rel="self" type="application/rss+xml" />
    <description>Top stories tagged to World on the Long Haul Ledger, with links to the original reports. Automatic location tags can be wrong; the badge on each story says how well it is confirmed.</description>
    <language>en-us</language>
    <lastBuildDate>Sat, 28 Nov 2026 20:03:29 GMT</lastBuildDate>
    <ttl>360</ttl>
    <item>
      <title>Iraq becomes India&apos;s No. 2 oil supplier; Gulf provides 41% supply, but Russia remains largest</title>
      <link>https://timesofindia.indiatimes.com/business/india-business/iraq-becomes-indias-second-largest-crude-supplier-since-middle-east-war-began-as-strait-of-hormuz-oil-flows-rise-despite-tanker-attacks-gulf-nations-supply-41-of-imports-while-russia-remains-remains-single-largest-supplier/articleshow/136244510.cms</link>
      <guid isPermaLink="false">live-xmt4kq</guid>
      <pubDate>Sat, 28 Nov 2026 13:40:44 GMT</pubDate>
      <description>Energy analytics firm Kpler estimates show that India imported 5.04 million barrels per day (mbd) between November 1 and 26. India&apos;s overall crude imports in November have remained largely at last year&apos;s level, with Russia, Iraq and Saudi Arabia continuing to rank as the country&apos; Source: Times of India Business. Single source.</description>
    </item>
    <item>
      <title>BAE Hägglunds lands record $6B deal for 400+ CV90s from five NATO nations</title>
      <link>https://breakingdefense.com/2026/11/bae-hagglunds-lands-record-6b-deal-for-400-cv90s-from-five-nato-nations/</link>
      <guid isPermaLink="false">live-kbwtwc</guid>
      <pubDate>Fri, 27 Nov 2026 19:57:02 GMT</pubDate>
      <description>The joint procurement by Finland, Lithuania, the Netherlands, Norway and Sweden is expressly linked to the threat from Russia. Source: Breaking Defense. Single source.</description>
    </item>
    <item>
      <title>SpaceX names its proposed $50 billion Cochise County, Arizona AI campus Colossus 3 ahead of a Dec. 9 zoning vote</title>
      <link>https://tucson.com/news/local/environment/elon-musk-reveals-name-for-massive-ai-data-center-in/article_7ed9d201-f9f3-4ea3-ad9a-29af4b65d71d.html</link>
      <guid isPermaLink="false">cur-us-az-spacex-colossus-3-cochise</guid>
      <pubDate>Fri, 27 Nov 2026 15:00:00 GMT</pubDate>
      <description>The 747 acre campus near Willcox would draw up to 6 GW when fully built, with up to nine computing buildings, dry cooling and no gas plant, and SpaceX says it would pay for $3.6 billion in grid upgrades and bring 1,000 jobs. Arizona&apos;s attorney general has asked the county to delay the vote. Source: Arizona Republic (via Arizona Daily Star). Reported by several outlets.</description>
    </item>
    <item>
      <title>Trump encouraged Venezuela and Iraq to exit OPEC: Reuters exclusive</title>
      <link>https://www.bnnbloomberg.ca/business/international/2026/11/27/us-pushed-venezuela-iraq-to-consider-leaving-opec-sources-say-reuters-exclusive/</link>
      <guid isPermaLink="false">live-uc4xq2</guid>
      <pubDate>Sat, 28 Nov 2026 01:41:08 GMT</pubDate>
      <description>The U.S. pressured Venezuela and Iraq to consider leaving OPEC, sources say, in a move that could reshape the global oil market and weaken the group. Source: BNN Bloomberg. Reported by several outlets.</description>
    </item>
    <item>
      <title>Gazprom plans to turn idle Russian gas facilities into power plants to help meet data centre demand</title>
      <link>https://live.euronext.com/en/financial-news/gazprom-plans-turn-idle-russian-gas-facilities-power-plants-help-meet-data-centre</link>
      <guid isPermaLink="false">cur-ru-gazprom-compressor-stations-to-power-400mw</guid>
      <pubDate>Fri, 27 Nov 2026 16:38:00 GMT</pubDate>
      <description>Gazprom has identified 400 MW of pilot projects to convert idle gas compressor stations, left underused after exports to Europe stopped, into power plants to ease shortages in southern and central Russia and serve data centers. An Energy Ministry official put conversion at about 18 months; the ministry estimates data center demand could triple to 15 GW by 2030. Source: Reuters (via Euronext). Single source.</description>
    </item>
    <item>
      <title>Oil, gas prices fall as Brent trims weekly gains ahead of OPEC+ meeting</title>
      <link>https://www.aa.com.tr/en/economy/oil-gas-prices-fall-as-brent-trims-weekly-gains-ahead-of-opec-meeting/4140823</link>
      <guid isPermaLink="false">live-vvgncc</guid>
      <pubDate>Fri, 27 Nov 2026 17:31:33 GMT</pubDate>
      <description>Brent crude drops 2.3% to $94.15 a barrel, while European natural gas falls 3.3% amid supply concerns and recovering Gulf exports Source: Anadolu Agency Economy. Single source.</description>
    </item>
    <item>
      <title>Türkiye, Russia reaffirm $100B bilateral trade target, sign joint declaration in Istanbul</title>
      <link>https://www.aa.com.tr/en/economy/turkiye-russia-reaffirm-100b-bilateral-trade-target-sign-joint-declaration-in-istanbul/4140083</link>
      <guid isPermaLink="false">live-19cp0b8</guid>
      <pubDate>Fri, 27 Nov 2026 08:56:20 GMT</pubDate>
      <description>Trade Minister Omer Bolat, Russian Deputy Prime Minister Alexander Novak co-chair 20th Intergovernmental Commission meeting as trade exceeds $50B Source: Anadolu Agency Economy. Single source.</description>
    </item>
    <item>
      <title>RBI Governor pegs AI’s potential economic value to MSMEs at $685 billion, urges faster adoption</title>
      <link>https://www.thehindu.com/business/Industry/rbi-governor-pegs-ais-potential-economic-value-to-msmes-at-685-billion-urges-faster-adoption/article71751516.ece</link>
      <guid isPermaLink="false">live-z9qpjm</guid>
      <pubDate>Fri, 27 Nov 2026 16:46:37 GMT</pubDate>
      <description>“This is entirely doable,” the Governor said, encouraging enterprises to begin with practical applications such as digital accounting, inventory management, quality control and customer engagement before expanding their use of AI. Source: The Hindu Business. Single source.</description>
    </item>
    <item>
      <title>Bruce C Project meets key milestone with submission of Impact Statement and Licence to Prepare Site Application</title>
      <link>https://www.globenewswire.com/news-release/2026/11/27/3411452/0/en/bruce-c-project-meets-key-milestone-with-submission-of-impact-statement-and-licence-to-prepare-site-application-as-bruce-power-advances-plan-to-power-ontario-and-its-economy.html</link>
      <guid isPermaLink="false">cur-ca-bruce-c-impact-statement-4800mw</guid>
      <pubDate>Fri, 27 Nov 2026 17:45:00 GMT</pubDate>
      <description>Bruce Power filed its Impact Statement and Licence to Prepare Site application with Canada&apos;s Impact Assessment Agency and Nuclear Safety Commission for Bruce C, up to 4,800 MW of new nuclear capacity at its site in Kincardine, Ontario. Ontario says construction would create 18,900 jobs, and the addition would lift Bruce Power to 12,000 MW, the largest nuclear generator in the world. Source: Bruce Power (GlobeNewswire). Confirmed.</description>
    </item>
    <item>
      <title>West Africa: Why Liberia Should Not Rush to Sign the Proposed U.S.$5.7 Billion Infrastructure Agreement</title>
      <link>https://allafrica.com/stories/202611270639.html</link>
      <guid isPermaLink="false">live-1dy7vsp</guid>
      <pubDate>Fri, 27 Nov 2026 18:16:10 GMT</pubDate>
      <description>[Liberian Observer] Liberia&apos;s desperate need for infrastructure development must never become an excuse for entering into economically disadvantageous agreements. Despite decades of foreign exploitation of its natural resources, Liberia remains among the world&apos;s poorest countries Source: AllAfrica Business. Single source.</description>
    </item>
    <item>
      <title>Ahsan seeks zero-tariff access to Chinese market</title>
      <link>https://www.dawn.com/news/2047560/ahsan-seeks-zero-tariff-access-to-chinese-market</link>
      <guid isPermaLink="false">live-1ej7c7d</guid>
      <pubDate>Sat, 28 Nov 2026 00:02:17 GMT</pubDate>
      <description>BEIJING: Federal Minister for Planning, Development and Special Initiatives Ahsan Iqbal has sought China’s support for preferential, zero-tariff access for Pakistani goods to its market, aiming to increase Pakistan’s annual exports to China from around $3 billion to $20-25 billio Source: Dawn Business. Single source.</description>
    </item>
    <item>
      <title>Oil notches first weekly gain in November on supply fears</title>
      <link>https://www.gulf-times.com/article/739163/business/oil-notches-first-weekly-gain-in-november-on-supply-fears</link>
      <guid isPermaLink="false">live-8x1xtd</guid>
      <pubDate>Fri, 27 Nov 2026 21:00:00 GMT</pubDate>
      <description>OilBrent crude edged down on Friday but snapped a three-week losing streak to notch its first weekly gain in November, as attacks on tankers in the Strait of Hormuz and Saudi energy infrastructure fan... Source: Gulf Times. Reported by several outlets.</description>
    </item>
    <item>
      <title>Global maritime trade set for zero growth in 2026: UN</title>
      <link>https://www.gulf-times.com/article/739157/business/global-maritime-trade-set-for-zero-growth-in-2026-un</link>
      <guid isPermaLink="false">live-17xkrmh</guid>
      <pubDate>Fri, 27 Nov 2026 21:00:00 GMT</pubDate>
      <description>Global maritime trade — which carries more than 80 % of the world&apos;s goods — is set to stagnate in 2026 due to shipping disruptions and trade uncertainties arising from the war in the Middle East,... Source: Gulf Times. Reported by several outlets.</description>
    </item>
    <item>
      <title>Kyrgyzstan attracts $5.9B in foreign direct investment over 5 years</title>
      <link>https://en.kabar.kg/news/kyrgyzstan-attracts-59b-in-foreign-direct-investment-over-5-years/</link>
      <guid isPermaLink="false">live-habxt1</guid>
      <pubDate>Fri, 27 Nov 2026 05:10:52 GMT</pubDate>
      <description>In the first 10 months of 2026, Kyrgyzstan’s real GDP grew by 10.5%, with fixed capital investment reaching 425.9 billion soms. Chairman of the Cabinet of Ministers speaks at the… Source: Kabar. Confirmed.</description>
    </item>
    <item>
      <title>Hormuz tensions drive higher electricity and gas prices in Lithuania, regulator says</title>
      <link>https://www.lrt.lt/en/news-in-english/19/3127235/hormuz-tensions-drive-higher-electricity-and-gas-prices-in-lithuania-regulator-says</link>
      <guid isPermaLink="false">live-pv2ung</guid>
      <pubDate>Fri, 27 Nov 2026 13:33:00 GMT</pubDate>
      <description>Higher household electricity and natural gas tariffs approved for the first half of 2027 are largely driven by tensions surrounding the Strait of Hormuz and broader geopolitical uncertainty, the head of Lithuania’s energy market regulator said Friday. Source: LRT English. Single source.</description>
    </item>
    <item>
      <title>Turkish-Russian direct investments hit $10B, says Turkish trade minister</title>
      <link>https://www.aa.com.tr/en/economy/turkish-russian-direct-investments-hit-10b-says-turkish-trade-minister/4140454</link>
      <guid isPermaLink="false">live-62fgwn</guid>
      <pubDate>Fri, 27 Nov 2026 13:01:23 GMT</pubDate>
      <description>Trade Minister Omer Bolat highlights 3,000 Russian firms in Türkiye, 1,300 Turkish companies in Russia, and $103B in completed contracting projects Source: Anadolu Agency Economy. Single source.</description>
    </item>
    <item>
      <title>Trump tariffs brought EU and Indonesia closer on trade, minister tells Euronews</title>
      <link>https://www.euronews.com/2026/11/27/trump-tariffs-brought-eu-and-indonesia-closer-on-trade-minister-tells-euronews</link>
      <guid isPermaLink="false">live-enkpmd</guid>
      <pubDate>Fri, 27 Nov 2026 14:29:14 GMT</pubDate>
      <description>US tariffs brought the EU and Indonesia closer, Indonesia&apos;s Coordinating Minister for Economic Affairs Airlangga Hartarto said in an exclusive interview with Euronews. After a decade of talks, the two sides signed a deal last week, and the minister expects it to lift trade by 50% Source: Euronews Business. Single source.</description>
    </item>
    <item>
      <title>Kazakhstan’s IT services exports surpass $1 billion – Tokayev</title>
      <link>https://en.kabar.kg/news/kazakhstans-it-services-exports-surpass-1-billion-tokayev/</link>
      <guid isPermaLink="false">live-opgqvi</guid>
      <pubDate>Fri, 27 Nov 2026 05:29:16 GMT</pubDate>
      <description>Kassym-Jomart Tokayev highlighted Kazakhstan’s well-developed system of electronic financial services, Qazinform News Agency reports, citing Akorda. “Favorable conditions have been created for technology entrepreneurship. Last year, exports of domestic IT… Source: Kabar. Confirmed.</description>
    </item>
    <item>
      <title>Sports minister highlights development of long-term plan as key achievement</title>
      <link>https://psmnews.mv/193348</link>
      <guid isPermaLink="false">live-1yithmn</guid>
      <pubDate>Sat, 28 Nov 2026 12:50:43 GMT</pubDate>
      <description>Source: PSM News. Confirmed.</description>
    </item>
    <item>
      <title>State Bank of Pakistan&apos;s reserves up $8m</title>
      <link>https://www.dawn.com/news/2047345/state-bank-of-pakistans-reserves-up-8m</link>
      <guid isPermaLink="false">live-13c4vfw</guid>
      <pubDate>Fri, 27 Nov 2026 03:50:03 GMT</pubDate>
      <description>KARACHI: Foreign exchange reserves held by the State Bank of Pakistan rose by $8 million to $21.59 billion during the week ending Nov 20, the central bank said on Thursday. The country’s total res­er­ves stood at $26.74bn, including $5.15bn held by commercial banks. Published in  Source: Dawn Business. Single source.</description>
    </item>
    <item>
      <title>Court rejects Argentina’s request to stop UK oil activity near Falklands</title>
      <link>https://www.aljazeera.com/news/2026/11/28/court-rejects-argentinas-request-to-stop-uk-oil-activity-near-falklands?traffic_source=rss</link>
      <guid isPermaLink="false">live-vjnjds</guid>
      <pubDate>Sat, 28 Nov 2026 13:24:24 GMT</pubDate>
      <description>An international tribunal refuses Buenos Aires&apos;s application, giving the green light to the project off the disputed region. Source: Al Jazeera. Reported by several outlets.</description>
    </item>
    <item>
      <title>Project to increase Trans Mountain pipeline flows starts up ahead of schedule</title>
      <link>https://globalnews.ca/news/12169033/trans-mountain-pipeline-flow-increase/</link>
      <guid isPermaLink="false">live-1govzv</guid>
      <pubDate>Fri, 27 Nov 2026 19:20:37 GMT</pubDate>
      <description>A further expansion of 210,000 barrels per day is expected to come into service by the end of 2028, bringing the system&apos;s total capacity to 1.19 billion barrels a day. Source: Global News Money (Canada). Reported by several outlets.</description>
    </item>
    <item>
      <title>Petronas and Staatsolie approve $1.6bn FID for Suriname gas field</title>
      <link>https://www.offshore-technology.com/news/petronas-staatsolie-1-6bn-fid-suriname-gas-field/</link>
      <guid isPermaLink="false">live-iwr3z0</guid>
      <pubDate>Fri, 27 Nov 2026 09:45:49 GMT</pubDate>
      <description>Petronas, via its subsidiary Petronas Suriname, and Suriname’s state oil company Staatsolie have announced a $1.6bn final investment decision (FID) for the development of the Sloanea gas field in Block 52 offshore the South American nation. Source: Offshore Technology. Reported by several outlets.</description>
    </item>
    <item>
      <title>Experts Doubt Venezuela’s Power Promise</title>
      <link>https://www.riotimesonline.com/venezuela-experts-doubt-7400-megawatt-power-plan/</link>
      <guid isPermaLink="false">live-16a2hbi</guid>
      <pubDate>Sat, 28 Nov 2026 18:42:59 GMT</pubDate>
      <description>Venezuela promises 7,400 megawatts and has opened its grid to private firms, but experts say the plan lacks fuel, open tenders and deadlines. The post Experts Doubt Venezuela’s Power Promise appeared first on The Rio Times . Source: The Rio Times. Single source.</description>
    </item>
    <item>
      <title>Constellation Completes $5B Sale of 4.4GW PJM Assets to LS Power</title>
      <link>https://www.rigzone.com/news/constellation_completes_5b_sale_of_44gw_pjm_assets_to_ls_power-26-nov-2026-185175-article/?rss=true</link>
      <guid isPermaLink="false">live-1rq6qny</guid>
      <pubDate>Thu, 26 Nov 2026 13:35:43 GMT</pubDate>
      <description>Part of Constellation&apos;s regulatory commitments related to its acquisition of Calpine, the sale to LS Power consisted of the Bethlehem, York 1 and York 2 facilities in Pennsylvania and Hay Road and Edge Moor in Delaware. Source: Rigzone. Reported by several outlets.</description>
    </item>
    <item>
      <title>COP31 leaders warn grids and storage can’t keep pace with renewable energy growth</title>
      <link>https://www.renewableenergyworld.com/power-grid/cop31-leaders-warn-grids-and-storage-cant-keep-pace-with-renewable-energy-growth/</link>
      <guid isPermaLink="false">live-15nkjkt</guid>
      <pubDate>Wed, 25 Nov 2026 11:00:00 GMT</pubDate>
      <description>With more than 2,000 GW of renewable projects awaiting grid connections, industry leaders say infrastructure bottlenecks — not generation costs — are becoming the biggest obstacle to the global energy transition. Source: Renewable Energy World. Reported by several outlets.</description>
    </item>
    <item>
      <title>Prime Minister at the European Council: Cohesion and the Common Agricultural Policy are essential for Europe</title>
      <link>https://www.gov.si/en/news/2026-11-26-prime-minister-at-the-european-council-cohesion-and-the-common-agricultural-policy-are-essential-for-europe/</link>
      <guid isPermaLink="false">live-1mpjwwe</guid>
      <pubDate>Thu, 26 Nov 2026 13:40:00 GMT</pubDate>
      <description>Prime Minister Janez Janša is in Brussels today, attending a meeting of the European Council. The main items on the agenda are the negotiations on the EU&apos;s next multiannual financial framework and how to provide Ukraine with stable and sustainable long-term financial support. Source: Government of Slovenia. Confirmed.</description>
    </item>
    <item>
      <title>EIB backs African minerals with $327M facility</title>
      <link>https://www.northernminer.com/news/eib-backs-african-minerals-with-327m-facility/1003898362/</link>
      <guid isPermaLink="false">live-1hc5nn5</guid>
      <pubDate>Fri, 27 Nov 2026 20:35:41 GMT</pubDate>
      <description>The European Investment Bank (EIB) and South Africa’s Industrial Development Corporation (IDC) agreed to jointly provide up to €300 million (US$327 million) to advance African... The post EIB backs African minerals with $327M facility appeared first on The Northern Miner . Source: The Northern Miner. Reported by several outlets.</description>
    </item>
    <item>
      <title>Solar power, batteries can cut electricity system costs by 40 pc</title>
      <link>https://timeskuwait.com/solar-power-batteries-can-cut-electricity-system-costs-by-40-pc/</link>
      <guid isPermaLink="false">live-93j20d</guid>
      <pubDate>Sat, 28 Nov 2026 12:00:01 GMT</pubDate>
      <description>Expanding solar power alongside battery storage could significantly lower electricity system costs worldwide during the 2030s, with economic benefits equivalent to 0.8 percent of global GDP by 2030, according to a study by the Schneider Electric Research Institute. The study, cit Source: Times Kuwait. Single source.</description>
    </item>
    <item>
      <title>Brent, WTI and the benchmarks that determine how much you pay for petrol</title>
      <link>https://www.thenationalnews.com/business/energy/2026/11/28/brent-wti-and-the-benchmarks-that-determine-how-much-you-pay-for-petrol/</link>
      <guid isPermaLink="false">live-q3dibn</guid>
      <pubDate>Sat, 28 Nov 2026 03:00:00 GMT</pubDate>
      <description>The UAE will announce its December petrol prices on Monday amid hopes they will continue on a downward trend following November&apos;s surprise drop . Brent is on track for a 14 per cent decline this month, while West Texas Intermediate is on pace to retreat about 17 per cent. UAE pet Source: The National (UAE). Single source.</description>
    </item>
  </channel>
</rss>
