Intel Rio Rancho packaging expansion

Intel · Intel Fab 9 and Fab 11X, Rio Rancho, Sandoval County, New Mexico

Operating

A $3.5 billion expansion that opened Fab 9 in January 2024 for high-volume advanced packaging, still operating in 2026.

Show on the map: Intel Rio Rancho packaging expansion

Next gate

Continue high-volume advanced packaging at Rio Rancho

Ongoing, as described in Intel's July 29, 2026 newsroom article

Intel's July 29, 2026 article describes Fab 9 and the Rio Rancho facilities as operating advanced packaging lines, including work to scale package sizes further by 2028. This page treats the $3.5 billion expansion as open and operating.

Every step so far, and what comes next

  1. DoneJanuary 24, 2024

    Fab 9 opens in Rio Rancho

    Intel opened Fab 9 as part of its $3.5 billion New Mexico advanced packaging investment and said high-volume production was underway with Fab 11X.

  2. DoneJuly 29, 2026

    Intel describes the New Mexico packaging lines as operating

    A company newsroom article detailed Foveros and other advanced packaging work at the Rio Rancho facilities.

  3. NextOngoing

    Continue high-volume advanced packaging

    The July 29, 2026 article describes ongoing operations at the site.