Track your favorite projects · Space

SpaceX Florida Gigabay

SpaceX · Roberts Road, Kennedy Space Center, Florida

Built, getting ready for its first Starship

A 380 ft hall to stack and refurbish Starships for launches from Florida.

The SpaceX Gigabay steel frame under construction at Kennedy Space Center, Florida, with cranes on the structure.
Photo: Olga Ernst via Wikimedia Commons, CC BY-SA 4.0, Jan 18, 2026. Taken while the frame was still going up.

Show on the map: Florida Gigabay

Next gate

Booster 23 and Ship 43 arrive from Starbase

No date set

SpaceX is preparing the Gigabay to host Booster 23 and Ship 43 for what would be the first Starship launch from Florida, at pad 39A.

Every step so far, and what comes next

  1. DoneJan 2025

    Starship site added at Roberts Road

    SpaceX got an extension north of Hangar X for Starship operations, including a Gigabay.

  2. DoneOct 2026

    Gigabay built, crane installed

    SpaceX has built the first Gigabay and installed at least one transfer-aisle bridge crane.

  3. DoneOct 2026

    Expansion goes to environmental review

    SpaceX and NASA applied to grow the campus from 167 to nearly 400 acres, with ship static-fire stands and a payload processing facility. A draft environmental assessment is out for review.

  4. NextNo date set

    First Starship vehicles arrive

    Booster 23 and Ship 43 are to ship from Starbase and be readied in the Gigabay.

  5. ExpectedNo date set

    First Starship launch from Florida

    SpaceX is pushing to fly Flight 16 from LC-39A as soon as possible.

Worth knowing

Our posts on this build

Last checked Nov 19, 2026. We add a step when it happens and link the source.

Tracking saves to this device only. No account, no email, free.