Walk Bridge replacement, Norwalk
Under construction
Replaces the 1896 swing bridge carrying the Northeast Corridor over the Norwalk River with a 240-foot vertical lift bridge.
Show on the map: Walk Bridge
- Figure$1.67 billionNortheast Corridor Commission (via Railway Age), Apr 2026
- What gets builtReplaces the 1896 swing bridge carrying the Northeast Corridor over the Norwalk River with a 240-foot vertical lift bridgeNortheast Corridor Commission (via Railway Age), Apr 2026
Next gate
Vertical lift bridge in service
Next
Construction of the 240-foot vertical lift bridge started in 2023.
Every step so far, and what comes next
-
DoneApril 2026
Under construction
Construction started in 2023.
Source: Northeast Corridor Commission (via Railway Age), Apr 2026
-
NextNext
Vertical lift bridge in service
Construction of the 240-foot vertical lift bridge started in 2023.
Source: Northeast Corridor Commission (via Railway Age), Apr 2026
Worth knowing
- Inventory lists $1,670,000,000 total; the 2023 construction contract was $925 million.
Last checked Nov 28, 2026. We add a step when it happens and link the source.